Table 4. CuSP system specification [11]

Subsystem Specification
Structure Mass – 14 kg
10 cm × 20 cm × 30 cm (6 unit)
EPS SwRI PPT 28 V Main Bus
SwRI LVPS +12 V, +/–5 V, +3.3 V
Clyde Space solar arrays
Clyde Space 60 Whr 8s2p
PL SwRi, SIS
NASA GSFC, MERiT
NASA JPL, VHM
PS Cold gas thrusters
ADCS 3-axis stabilization, Sun sensor, Star tracker
COMM JPL IRIS 2.0 X-band Transponder
2 JPL Low Gain Patch Array Antenna
1 JPL Medium Gain Patch Array Antenna
CuSP, CubeSat for Solar Particles; EPS, electric power system; PL, Payload; MERiT, miniaturized electron and proton telescope; VHM, vector helium magnetometer; PS, Propulsion System; ADCS, attitude determination and control system; COMM, Communication.